Home
Hardware
Configurator
Services
OEM Guides About us Warranty Contact
ESENDEFRITPT
Manufacturers · Choosing a supplier

How to compare OEM computer suppliers: the 12 questions to ask before signing

Two quotes with the same specification can hide two very different services. These twelve questions bring out what really matters when the computer goes inside your product: continuity, repeatability and what happens when something fails.

ACD&CO technical team7 November 20266 min read

Lead time and stock: questions 1 to 3

1. What is the lead time per unit and per batch? Working days in writing, not “subject to availability”. 2. What stock do you hold of the platform? Ask about the critical parts: motherboard, processor and graphics card. 3. Is there a second source? Every critical part should have a validated alternative, so that a stock-out does not stop your line.

Continuity: questions 4 to 6

4. How long do you keep the platform frozen? Ask for years, not months. 5. How do you notify an obsolescence? With enough notice and with the replacement proposed and validated. 6. Can we place a last-time buy? A final batch of the old platform, stored and numbered, while you validate the new one.

The answer to question 4 is what separates an OEM supplier from a shop that assembles computers: a shop changes parts every week because its customer does not notice; your product does.

Quality and imaging: questions 7 to 9

7. What test does each unit pass? A load test per unit, with a report, not a sample of the batch. 8. Do you load our image and serialise? Frozen system image, a serial number per machine and labelling with your brand if you want it. 9. What tests has the platform passed? For demanding environments, vibration, shock and temperature tests with a report.

Warranty and price: questions 10 to 12

10. What does the warranty cover and who pays shipping? Years of warranty, immediate replacement or repair, shipping included or not, and what happens with a unit installed at your customer’s site. 11. How is the price built? Volume tiers, what is included (assembly, testing, imaging, packaging) and how part price increases are handled. 12. What documentation do you deliver? Declarations of conformity, test reports, bill of materials and, from 2027, whatever the Cyber Resilience Act requires.

The twelve questions in one table

The twelve questions and the answer you should get
QuestionAnswer you should get
1. Lead time per unit and per batchWorking days in writing; at ACD&CO, 5 working days for catalogue machines and an agreed lead time in series
2. Platform stockReal stock of motherboard, processor and graphics card, not “to order”
3. Second sourceA validated alternative for every critical part
4. Frozen platformA commitment of years, in writing
5. Obsolescence noticeIn advance and with a proposed replacement
6. Last-time buyA numbered final batch while you validate the new platform
7. Per-unit testA load test per machine with a report; at ACD&CO, 24 hours
8. Imaging and serialisationFrozen image, serial number and a label with your brand
9. TestsVibration, shock and temperature with a report when the environment calls for it
10. WarrantyYears, immediate replacement and who pays shipping, in writing
11. PriceVolume tiers and a list of what is included
12. DocumentationConformity, tests, bill of materials and cyber resilience

Frequently asked questions

Why not just buy the computers from a shop?

Because a shop changes parts every week and does not guarantee that unit one hundred is the same as unit one. If the computer goes inside your product, every change is a revalidation and a risk in the field.

What lead time is reasonable?

For catalogue machines, a week. For an OEM series, the lead time agreed in the contract, with reserved stock of the critical parts. What matters is that it is in writing.

How is a part price increase handled?

It should be covered in the agreement: a fixed price per batch, a review by tiers or the part variation passed through with proof. What does not work is a surprise on the invoice.

What documentation should I require from the start?

Declaration of conformity, platform test reports, the bill of materials of each unit and the lifecycle commitment in writing. If you sell in the European Union, also whatever the Cyber Resilience Act requires.

Tell us about your product

Tell us what it does, where it will work and how many units a year. We will propose the machine, the lead time and the price in writing within 12 working hours.

Ask for a proposal

A proposal within 12 working hours

Tell us what you need

Tell us what it is for and we will reply with a configuration and its price. If you already have a quote from another brand, send it over and we will prepare the equivalent.

  • A written reply within 12 working hours
  • A single point of contact, from quote to warranty
  • No obligation: we only use your details to reply

+34 613 17 68 06info@acdcompany.es

This field is required.
Check the email: something is missing.

Or call us: +34 613 17 68 06