What regulation asks of the computer
If your product is a medical device, the whole system is assessed against the electrical safety standard IEC 60601-1 and its electromagnetic compatibility part (IEC 60601-1-2). The computer, as a component, contributes its power supply (a medical-grade supply or isolation in the system), its electromagnetic emission and immunity, and its documentation. If it is a laboratory instrument not used on patients, the reference is IEC 61010-1.
What the equipment manufacturer needs from the computer are documents: CE declaration of conformity, test reports for the power supply and electromagnetic compatibility, and the bill of materials. Ask for them before choosing, not when the notified body requests them.
Traceability: every unit documented
A quality management system (ISO 13485 for medical devices) requires knowing what each unit contains and when something changed. Ask for a serial number per computer, the component list for that unit, the outgoing test report and change control: no part is replaced without telling you and without a record.
Lifecycle: seven to ten years
A medical device sells for years and is supported for longer. Ask for a platform with a multi-year availability commitment, end-of-life notice in advance and an agreed last-time buy. For the operating system, Windows IoT Enterprise LTSC gives ten years of security updates without feature changes; on Linux, a long-term support distribution.
Daily use: cleaning, noise and start-up
In an operating theatre, a clinic or a laboratory, the unit is cleaned with disinfectants and cannot make noise. A fanless unit, or one with filtered, quiet airflow, copes better with dust and cleaning. Ask for automatic start when power is applied, for the unit to return to its state on its own after an outage and for unused ports to come disabled.
Performance: imaging, video and artificial intelligence
Many current devices process images: ultrasound, microscopy, endoscopy, automated sample analysis. If there is AI inference or image reconstruction, a GPU is needed; low-profile, low-power RTX PRO cards (such as the RTX PRO 2000 or the RTX PRO 4000 Blackwell) fit in compact units and bring ECC memory. For management, reports and the link to the hospital system, a low-power processor with 16 to 32 GB is enough.
Indicative starting points
| Type of equipment | Form factor | Starting point |
|---|---|---|
| Analyser or laboratory instrument with a screen | Fanless compact unit or panel PC | Low-power processor, 16 GB, industrial SSD, Windows IoT LTSC |
| Imaging equipment (ultrasound, microscopy) | Compact unit with a GPU | Low-profile RTX PRO card, 32 GB, NVMe for the images |
| Diagnostic station with artificial intelligence | Quiet tower or 10-litre compact unit | 24 GB GPU or more, 64 GB of ECC memory, two mirrored SSDs |
| Cart or mobile equipment | Compact unit with DC input | 12 to 24 V input, automatic start, fanless |
Related hardware and guides
Frequently asked questions
Does the computer have to be certified as a medical device?
No: the complete product is certified, and the computer is a component. What you need from it are a suitable power supply, electromagnetic compatibility reports and documentation, to include in the technical file. Always confirm it with your regulatory adviser.
Which operating system is right?
For long-life products, Windows IoT Enterprise LTSC (ten years of security updates without feature changes) or a Linux distribution with long-term support. We load your image and keep it frozen.
Can you guarantee the same configuration for years?
We work with long-lifecycle platforms, give advance notice of any end of production and agree the last-time buy or a validated replacement with you. Every unit ships with its serial number and its component list.
What if the device carries a GPU for artificial intelligence?
Low-profile, low-power RTX PRO cards fit in compact units and bring ECC memory. We size the GPU for the model you will run in production and test the unit for 24 hours at full load.
Tell us about your product
Tell us what it does, where it will work and how many units a year. We will propose the machine, the lead time and the price in writing within 12 working hours.